Lukoil WQ2 Oilfield | Central Processing Facility
The Project is to build Central Processing Facility (CPF) by Samsung Engineering to LUKOIL Co. at West Qurna II (WQ2), and three Well Clusters.
CEG, started the first concrete repair contract with the main Concrete supplier to the project (77 Insaat), CEG executed the work which included but not limited Repair concrete cracks, Expansion joints, supply of concrete admixtures for the new foundations of the project, Cement Grout and Epoxy Grout for the most of the foundations in the project.
CEG, executed the same repairs for another three well clusters.
BASF Chemicals material were mainly used.
And with the progress of work on site and with a good performance, CEG executed the following work:
- 12000m2 of HDPE for Evaporation Ponds, thickness 2mm.
- Insulation of piping work at the CPF of 1800m of different diameters, Armacell materials were used
- Fireproofing coating – CEG applied Cementitious fireproofing for the most steel structure at the site
- Applying of Industrial Epoxy flooring for the Warehouses of an area of 40000m2
- Applying Ceramic Coating for the flare area using Belzona Materials
- Tar Epoxy coating for the foundation area of the Ground Power transformers
- Applying of Ant-Corrosive and protective coating for the oil storage tanks and water tanks
Project Details
DATE
2013
CLIENT
Lukoil, WQ2 Oilfield
PROJECT TYPE
AREA (m2)
12000 + 40000