self-leveling screed Archives - CEG Construction Engineering Group Experts in construction solutions and applications Sun, 27 Mar 2022 15:45:42 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.3 203067828 Rehabilitation of Iraqi military airplanes hangars https://ceg.zcreations.com/portfolio-items/rehabilitation-of-iraqi-military-airplanes-hangars/ Mon, 07 Dec 2015 00:55:52 +0000 https://ceg.zcreations.com/?post_type=avada_portfolio&p=1828 Concrete surface repair and Epoxy Flooring. Industrial flooring of 50000 m2 for military hangars using 2mm thickness fuel resistant epoxy materials.

The post Rehabilitation of Iraqi military airplanes hangars appeared first on CEG Construction Engineering Group.

]]>

self-leveling screed

It was required to prepare the surface of the Maintenance Division that includes: Airplane Hangars, NDT, SKD and other units within the Division. Our work was preparing the ground surface, self-leveling screed, preparing the expansion joints and applying of epoxy industrial flooring.

Project Details

DATE

2025

CLIENT

MoD – Iraqi Air Force

PROJECT TYPE
Area (m2)

50000

TAGS | SKILLS

The post Rehabilitation of Iraqi military airplanes hangars appeared first on CEG Construction Engineering Group.

]]>
1828
KIA Motors Showroom https://ceg.zcreations.com/portfolio-items/kia-motors-showroom/ Sun, 07 Dec 2014 00:55:52 +0000 https://ceg.zcreations.com/?avada_portfolio=maine-modernity-2 KIA Motors opened a showroom and a maintenance center.  CEG did the surface preparation fix the damaged areas with mortars and bonding agents a self-leveling and an industrial epoxy coating of 2.5 mm thickness for an area of approximately 5000 m2.

The post KIA Motors Showroom appeared first on CEG Construction Engineering Group.

]]>

self-leveling screed

KIA Motors opened a showroom and a maintenance center.  CEG did the surface preparation fix the damaged areas with mortars and bonding agents a self-leveling and an industrial epoxy coating of 2.5 mm thickness for an area of approximately 5000 m2.

Project Details

DATE

2025

CLIENT

KIA Motors

PROJECT TYPE
AREA (m2)

5000

TAGS / SKILLS

The post KIA Motors Showroom appeared first on CEG Construction Engineering Group.

]]>
1725