Epoxy flooring Archives - CEG Construction Engineering Group Experts in construction solutions and applications Mon, 04 Apr 2022 11:10:19 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.3 203067828 Baghdad Pepsi Factory https://ceg.zcreations.com/portfolio-items/baghdad-pepsi-factory/ Wed, 07 Dec 2016 00:55:52 +0000 https://ceg.zcreations.com/?post_type=avada_portfolio&p=1810 Industrial flooring of 8000 m2 using 2mm thickness epoxy materials for Baghdad Pepsi Factory.

The post Baghdad Pepsi Factory appeared first on CEG Construction Engineering Group.

]]>

Epoxy flooring

The client planned to increase the production lines for their factory which required removing old flooring for the existing production line.  CEG, executed the work that include removing for the old flooring system, applying a self-leveling flooring, expansion joints and industrial epoxy flooring.

For the new production lines CEG executed Epoxy grout for the new machinery and expansion joints with surface preparation and industrial Epoxy flooring.

Material supplier; Fosroc Chemicals

Project Details

DATE

2025

CLIENT

Baghdad Pepsi Factory

PROJECT TYPE
Area (m2)

8000

TAGS | SKILLS

The post Baghdad Pepsi Factory appeared first on CEG Construction Engineering Group.

]]>
1810
Rehabilitation of Iraqi military airplanes hangars https://ceg.zcreations.com/portfolio-items/rehabilitation-of-iraqi-military-airplanes-hangars/ Mon, 07 Dec 2015 00:55:52 +0000 https://ceg.zcreations.com/?post_type=avada_portfolio&p=1828 Concrete surface repair and Epoxy Flooring. Industrial flooring of 50000 m2 for military hangars using 2mm thickness fuel resistant epoxy materials.

The post Rehabilitation of Iraqi military airplanes hangars appeared first on CEG Construction Engineering Group.

]]>

Epoxy flooring

It was required to prepare the surface of the Maintenance Division that includes: Airplane Hangars, NDT, SKD and other units within the Division. Our work was preparing the ground surface, self-leveling screed, preparing the expansion joints and applying of epoxy industrial flooring.

Project Details

DATE

2025

CLIENT

MoD – Iraqi Air Force

PROJECT TYPE
Area (m2)

50000

TAGS | SKILLS

The post Rehabilitation of Iraqi military airplanes hangars appeared first on CEG Construction Engineering Group.

]]>
1828
KIA Motors Showroom https://ceg.zcreations.com/portfolio-items/kia-motors-showroom/ Sun, 07 Dec 2014 00:55:52 +0000 https://ceg.zcreations.com/?avada_portfolio=maine-modernity-2 KIA Motors opened a showroom and a maintenance center.  CEG did the surface preparation fix the damaged areas with mortars and bonding agents a self-leveling and an industrial epoxy coating of 2.5 mm thickness for an area of approximately 5000 m2.

The post KIA Motors Showroom appeared first on CEG Construction Engineering Group.

]]>

Epoxy flooring

KIA Motors opened a showroom and a maintenance center.  CEG did the surface preparation fix the damaged areas with mortars and bonding agents a self-leveling and an industrial epoxy coating of 2.5 mm thickness for an area of approximately 5000 m2.

Project Details

DATE

2025

CLIENT

KIA Motors

PROJECT TYPE
AREA (m2)

5000

TAGS / SKILLS

The post KIA Motors Showroom appeared first on CEG Construction Engineering Group.

]]>
1725
Lukoil WQ2 Oilfield | Central Processing Facility https://ceg.zcreations.com/portfolio-items/lukoil-wq2-oilfield-central-processing-facility/ Sat, 07 Dec 2013 00:55:52 +0000 https://ceg.zcreations.com/portfolio-items/rumaila-oil-field-evaporation-pond-lining-2/ Central Processing Facility – CPF and Well Clusters at WQ2 major rehabilitation of concrete work, industrial coating, and HDPE lining, insulation and fireproofing coating

The post Lukoil WQ2 Oilfield | Central Processing Facility appeared first on CEG Construction Engineering Group.

]]>

Epoxy flooring

The Project is to build Central Processing Facility (CPF) by Samsung Engineering to LUKOIL Co. at West Qurna II (WQ2), and three Well Clusters.

CEG, started the first concrete repair contract with the main Concrete supplier to the project (77 Insaat), CEG executed the work which included but not limited Repair concrete cracks, Expansion joints, supply of concrete admixtures for the new foundations of the project, Cement Grout and Epoxy Grout for the most of the foundations in the project.

CEG, executed the same repairs for another three well clusters.

BASF Chemicals material were mainly used.

And with the progress of work on site and with a good performance, CEG executed the following work:

  • 12000m2 of HDPE for Evaporation Ponds, thickness 2mm.
  • Insulation of piping work at the CPF of 1800m of different diameters, Armacell materials were used
  • Fireproofing coating – CEG applied Cementitious fireproofing for the most steel structure at the site
  • Applying of Industrial Epoxy flooring for the Warehouses of an area of 40000m2
  • Applying Ceramic Coating for the flare area using Belzona Materials
  • Tar Epoxy coating for the foundation area of the Ground Power transformers
  • Applying of Ant-Corrosive and protective coating for the oil storage tanks and water tanks

Project Details

DATE

2025

CLIENT

Lukoil, WQ2 Oilfield

PROJECT TYPE
AREA (m2)

12000 + 40000

The post Lukoil WQ2 Oilfield | Central Processing Facility appeared first on CEG Construction Engineering Group.

]]>
1982
Baghdad International Airport | Road Marking Paint https://ceg.zcreations.com/portfolio-items/baghdad-international-airport-road-marking-paint/ Sun, 07 Dec 2003 00:55:52 +0000 https://ceg.zcreations.com/?avada_portfolio=maine-modernity-2-2 CEG, applied major repair work for Baghdad International Airport including the repair of damaged areas of the Runway and Taxiway of the airport also the replacement of expansion joints materials and the removal of rubber caused by airplane tires and the marking of the runway and taxiway with ground lighting.

The post Baghdad International Airport | Road Marking Paint appeared first on CEG Construction Engineering Group.

]]>

Epoxy flooring

CEG, applied major repair work for Baghdad International Airport including the repair of damaged areas of the Runway and Taxiway of the airport also the replacement of expansion joints materials and the removal of rubber caused by airplane tires and the marking of the runway and taxiway with ground lighting.

Material suppliers: BASF Chemicals and Solo Paint.

Project Details

DATE

2025

CLIENT

Baghdad International Airport

PROJECT TYPE

The post Baghdad International Airport | Road Marking Paint appeared first on CEG Construction Engineering Group.

]]>
1738